Part #:
L1000841
ERICSON DECOMMISSIONING AND DECONTAMINATING NUCLEAR FACILITIES, APPLICATIONS/SOLUTIONS GUIDE, Print On Demand (POD)
Decommissioning and Decontaminating Nuclear Facilities
Today’s typical nuclear plant is designed for an operating cycle of 40 to 60 years. Although this is a significant jump from the 30 year lifespan in earlier modules, modern plants still require a thorough decommission and decontamination (D&D) when the facilities have fully depreciated in usefulness. A successful D&D will either enable existing structures to be repurposed, or set the property up for demolition so an entirely new operation can be built from the ground up.
Please Print On Demand (POD) by selecting Download icon. If you wish Ericson to provide you with printed copies, please select a minimum of 25pcs.
Documents
Application / Solutions Guide
Specifications
Active Revision | A |
---|---|
MarketSegment | Power Generation |
PublicationType | 3. Application/Solutions Guide |
Brand | Ericson |
Sub Category | Various - System Solution |