Part #:
L1000807
ERICSON PRE-CONSTRUCTION CHECKLIST, APPLICATIONS/SOLUTIONS GUIDE, Print On Demand (POD)
Pre-Construction Project Planning
Be Prepared
While construction planning begins with the bidding process, the majority of the planning process takes place during pre-construction stages. Use this pre-construction guide to effectively plan your next project.
In this free checklist you will find:
1. The various categories for pre-construction planning
2. A handy list of cost codes for specifying power and lighting products
3. Tips for staying on budget for temporary lighting and power
4. A worksheet for planning temporary power and lighting
Active Revision | B |
---|---|
Ideal Application | Please Print On Demand (POD) by selecting Download icon. If you wish Ericson to provide you with printed copies, please select a minimum of 25pcs. |
Country of Origin | USA |
- Availability:
-
BOM
Specifications
Active Revision | B |
---|---|
MarketSegment | Construction |
PublicationType | 3. Application/Solutions Guide |
Brand | Ericson |
Sub Category | Various - System Solution |
Other Resources
Technical Info
Standards & Certifications
RoHS | RoHS Compliant |
---|
Shipping & Logistics Info
Pack/Unit Qty | 20 |
---|---|
HTS code | 4911100080 |
ECCN | EAR99 |
Gross Weight (lbs) | 0.01000 |
Warranty | 1 Year |